Running Pex In Ceiling. I will be using a combination mostly of 1 and 3/4 pex (some 3/8 of course at the fixtures) and all seems pretty straightforward. It is 16 degrees here today.

Diary of a Right Wing Pussycat Plumbing with Pex Tubing and Sharkbite
Diary of a Right Wing Pussycat Plumbing with Pex Tubing and Sharkbite from rightwingcat.blogspot.com

I get very focused on aesthetics sometimes (i think a quality job should look like a quality job) but that would require a lot more time in the attic. However, i am uncertain of how to run the pex around a corner wall. Once i get to the bathrooms and kitchen the pex lines would drop into the wall studs.

Or You Could Remove The Drywall And Look First, And Then Add Hours To The Job And Add Drywall Patching To That Too.


But even if you install pex fittings in a conventional main line and branch system, the connections are quicker to make than soldering copper. Those guys, typically in that first floor ceiling, you’re going to see holes everywhere. Often, the most economical way to replace the original plumbing is running pvc, cpvc or pex tubing through existing walls, ceilings and crawl spaces.

I Will Be Using A Combination Mostly Of 1 And 3/4 Pex (Some 3/8 Of Course At The Fixtures) And All Seems Pretty Straightforward.


I need to run pex from one side of the room to the other for the washing machine. Unfortunately my joists run perpendicular to where i want to run the pipe and i have a finished ceiling. In the case of your 2×10 joists, the maximum diameter is 35⁄64 in.

Line To Each Fixture From A Central Spot.


It is also important to run the pipe as low in the attic as possible to provide heat from the ceiling below. Depending on the pipe size and code, space the hangers between 32 inches and 48 inches apart. Water would be directed by the pvc to the ends of the pvc and save the ceiling from all water damage.

A Wooden Floor Joist Is A Beam.


Either way theyre both outside. Should i run the pex in the ceiling where it will run alone the joist of the ceiling or under the floor joists? Who knows what you would find if you opened up the ceiling there.

If Possible, Run It Under The Attic Insulation For An Added Layer Of Protection.


If running vertically, it should be supported every 4 to 6 feet. Without going into all the math, bending is at a max at the top and bottom of the cross section of the beam. I get very focused on aesthetics sometimes (i think a quality job should look like a quality job) but that would require a lot more time in the attic.